{"id":2491,"date":"2024-02-21T14:18:08","date_gmt":"2024-02-21T14:18:08","guid":{"rendered":"https:\/\/www.platanias.gr\/energy-conservation-energy-savings-and-use-of-renewable-energy-sources-res-in-the-building-of-the-vukolion-gym-lycleium-school\/"},"modified":"2024-03-13T14:35:15","modified_gmt":"2024-03-13T14:35:15","slug":"energy-conservation-energy-savings-and-use-of-renewable-energy-sources-res-in-the-building-of-the-vukolion-gym-lycleium-school","status":"publish","type":"page","link":"https:\/\/www.platanias.gr\/en\/energy-conservation-energy-savings-and-use-of-renewable-energy-sources-res-in-the-building-of-the-vukolion-gym-lycleium-school\/","title":{"rendered":"ENERGY CONSERVATION, ENERGY SAVINGS AND USE OF RENEWABLE ENERGY SOURCES (RES) IN THE BUILDING OF THE VUKOLION GYM &#8211; LYCLEIUM &#8211; SCHOOL."},"content":{"rendered":"\n<p><strong>Operational Programme: <\/strong> \u00abCrete\u00bb<\/p>\n\n<p><strong>Priority axis :<\/strong><\/p>\n\n<p>Sustainable Development by upgrading the environment and addressing the impacts of climate change in Crete<\/p>\n\n<p>&#8220;Action 4.c.1: Energy saving in public buildings&#8221;<\/p>\n\n<p><strong>Specific Objective:<\/strong><\/p>\n\n<p>Increasing the energy efficiency of buildings<\/p>\n\n<p><strong>Beneficiary:<\/strong>MUNICIPALITY OF PLATANIA<\/p>\n\n<p><strong>Disbursement Fund:<\/strong>\u0395\u03a4\u03a0\u0391<\/p>\n\n<p><strong>Budget\u0394.\u0394.: <\/strong>299.340,01\u20ac<\/p>\n\n<p><strong>Co-funded \u0394.\u0394.: <\/strong>299.340,01\u20ac<\/p>\n\n<p><strong>Date of inclusion: <\/strong>25\/01\/2021<\/p>\n\n<p><strong>Code \u039f\u03a0\u03a3: <\/strong> 5069464<\/p>\n\n<p>The physical scope of the project includes the energy upgrade of the building of the Voukolies High School of the Municipality of Platanias with actions\/interventions that will lead to the energy upgrade of the building unit with the ultimate aim of saving energy and resources, reducing operating costs and reducing the environmental footprint of CO2.<\/p>\n\n<p>The proposed interventions consist of:<\/p>\n\n<ul>\n<li>Replacement of three windows on the floor of the building.<\/li>\n\n\n\n<li>Heat pump replacement<\/li>\n\n\n\n<li>Heating system replacement (piping, fancoils type radiators)<\/li>\n\n\n\n<li>Installation of a photovoltaic system with energy offsetting (net metering)<\/li>\n\n\n\n<li>Replacement of luminaires with new LED technology.<\/li>\n\n\n\n<li>BEMS system installation<\/li>\n\n\n\n<li>Exterior painting of the entire shell with thermosetting paints<\/li>\n<\/ul>\n\n<p>Also under the project will be provided Consultancy Services for energy issues and energy inspections for the building of the Gymnasium &#8211; Lyceum Voukolies of the Municipality of Platanias.<\/p>\n\n<p><strong>Contract\/Duration\/Amount:<\/strong> <strong> <\/strong>14-03-2022\/ 365 days\/ 174.083,65 \u20ac (including VAT.)<\/p>\n\n<p><strong>Contractor:<\/strong><strong> <\/strong>Kotsiopoulos Ioannis<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/www.platanias.gr\/wp-content\/uploads\/2024\/02\/&#x3C6;&#x3C9;&#x3C4;&#x3BF;.png\" alt=\"\" class=\"wp-image-1781\"\/><\/figure>\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\"  class=\"wp-block-file__embed\" data=\"https:\/\/www.platanias.gr\/wp-content\/uploads\/2024\/02\/&#x391;&#x3C0;&#x3BF;&#x3C6;&#x3B1;&#x3C3;&#x3B7;_&#x3B5;&#x3BD;&#x3C4;&#x3B1;&#x3BE;&#x3B7;&#x3C2;-1.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of &#x391;&#x3C0;&#x3BF;&#x3C6;&#x3B1;&#x3C3;&#x3B7;_&#x3B5;&#x3BD;&#x3C4;&#x3B1;&#x3BE;&#x3B7;&#x3C2;-1.\"><\/object><a id=\"wp-block-file--media-a16030b5-e865-4fde-85cc-dae6a5ff4ce6\" href=\"https:\/\/www.platanias.gr\/wp-content\/uploads\/2024\/02\/&#x391;&#x3C0;&#x3BF;&#x3C6;&#x3B1;&#x3C3;&#x3B7;_&#x3B5;&#x3BD;&#x3C4;&#x3B1;&#x3BE;&#x3B7;&#x3C2;-1.pdf\">Decision_inclusion-1<\/a><a href=\"https:\/\/www.platanias.gr\/wp-content\/uploads\/2024\/02\/&#x391;&#x3C0;&#x3BF;&#x3C6;&#x3B1;&#x3C3;&#x3B7;_&#x3B5;&#x3BD;&#x3C4;&#x3B1;&#x3BE;&#x3B7;&#x3C2;-1.pdf\" class=\"wp-block-file__button wp-element-button\" download=\"\" aria-describedby=\"wp-block-file--media-a16030b5-e865-4fde-85cc-dae6a5ff4ce6\">Download from<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Operational Programme: \u00abCrete\u00bb Priority axis : Sustainable Development by upgrading the environment and addressing the impacts of climate change in Crete &#8220;Action 4.c.1: Energy saving in public buildings&#8221; Specific Objective: Increasing the energy efficiency of buildings Beneficiary:MUNICIPALITY OF PLATANIA Disbursement Fund:\u0395\u03a4\u03a0\u0391 Budget\u0394.\u0394.: 299.340,01\u20ac Co-funded \u0394.\u0394.: 299.340,01\u20ac Date of inclusion: 25\/01\/2021 Code \u039f\u03a0\u03a3: 5069464 The physical [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"ub_ctt_via":"","footnotes":""},"acf":[],"featured_image_src":null,"_links":{"self":[{"href":"https:\/\/www.platanias.gr\/en\/wp-json\/wp\/v2\/pages\/2491"}],"collection":[{"href":"https:\/\/www.platanias.gr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.platanias.gr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.platanias.gr\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.platanias.gr\/en\/wp-json\/wp\/v2\/comments?post=2491"}],"version-history":[{"count":1,"href":"https:\/\/www.platanias.gr\/en\/wp-json\/wp\/v2\/pages\/2491\/revisions"}],"predecessor-version":[{"id":2492,"href":"https:\/\/www.platanias.gr\/en\/wp-json\/wp\/v2\/pages\/2491\/revisions\/2492"}],"wp:attachment":[{"href":"https:\/\/www.platanias.gr\/en\/wp-json\/wp\/v2\/media?parent=2491"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}